Jeffreys Court Flats, Swansea
Lift works - Work in progress We are currently working on a very involved and complicated project in conjunction with our Structural Engineer. Structural calculations and design of
The Heath Hospital
CBES were employed to cut slots in the shaft cap and design, fabricate and fit steel structure to reinforce the cap after the slots were cut.
The Colonnade, One Canada Square, London
One of the tallest buildings in the UK, One Canada Square is in a prestigious location of offices and retail. CBES were tasked with designing, fabricating, and fitting
Care Home, Stockport
New Steel Lift Shaft Structure and Other Builders Works CBES were contracted to carry out all enabling works to include lift removal. It was found after the lift
Pure Gym, Bristol
Builder works to new lift installation CBES was originally contracted to undertake all builders enabling works including building, mechanical, electrical, flooring, decorating and lift removal. Following further detailed
Welsh Rugby Union Shop, Cardiff
Platform Lift Working safely within an operational busy shop and not inconvenience the general public, CBES stripped out an existing 2 stop platform service lift and associated equipment
Testing Lifting Beams
As a full member of LEEA Lifting Equipment Engineers Association we are qualified to test all your lifting beam requirements and certify. We have tested lifting beams for
Hoardings
Contact CBES for the supply and installation of hoardings, including bespoke hoardings and 2 hour rated certificated fireproof hoardings.
Heathrow Airport, D’Albiac House
Stripping lift and removal by cranage CBES stripped the old lift and removed by the old lift by cranage. To enable the lift installation CBES fitted new steelwork
Channel 4
Steel Works, Architraves and Electrical Works Contracted to carry out detailed steel modernisations to the shaft cap of the external scenic lifts. The work involved the design, fabrication
Avon Gorge Hotel
Remove old lift and building works Contracted by Otis to remove the lift and alter the lift shaft to accommodate the new Gen 2 MRL Lift. Contracted by
GlaxoSmithKline, London Core Drilling
Using specialist diamond drilling tools, allowing us to cut through the toughest reinforced concrete. As demonstrated, in the pictures below, in the photos at GlaxoSmithKline offices drilling through
Lift Regulations For Disabled Users – What You Need To Know
Whether you are designing or building a lift for commercial or private use, you carry responsibility for the safety of individuals using the lift, as specified in the
Whatley Manor, Malmesbury
Pump out lift pit in the beautiful Relais Chateaux, Whatley Manor, Malmesbury. CBES pumped out 500 litres of contaminated water in the lift pit of the Whatley Manor
Hinkley Point
4 Stop lift removal. Following completion of full security clearance (BSVR), CBES erected hoarding and removed a 4 stop lift. Works were completed in under 4 days.
The Mall Shopping Centre, Cribbs Causeway
During out of hours working, CBES isolated lift and fitted scaffolding enable lift maintenance works to be completed.
Otis Working In Conjunction With CBES (UK) Ltd
We are very pleased to announce that over 20 years of working with Otis, CBES has proved to be a cost effect, reliable and a safe contractor. Otis