Project Description
Pump out lift pit in the beautiful Relais Chateaux, Whatley Manor, Malmesbury. CBES pumped out 500 litres of contaminated water in the lift pit of the Whatley Manor Hotel. Floor protection was laid in a designated route to ensure limited disruption to guests. A sump pump pumped the contaminated water into 25 litre barrels. The water was disposed of by CBES as a certified waster carrier.