Otis Working In Conjunction With CBES (UK) Ltd
We are very pleased to announce that over 20 years of working with Otis, CBES has proved to be a cost effect, reliable and a safe contractor. Otis
The Mall Shopping Centre, Cribbs Causeway
During out of hours working, CBES isolated lift and fitted scaffolding enable lift maintenance works to be completed.
Hinkley Point
4 Stop lift removal. Following completion of full security clearance (BSVR), CBES erected hoarding and removed a 4 stop lift. Works were completed in under 4 days.
Whatley Manor, Malmesbury
Pump out lift pit in the beautiful Relais Chateaux, Whatley Manor, Malmesbury. CBES pumped out 500 litres of contaminated water in the lift pit of the Whatley Manor
Lift Regulations For Disabled Users – What You Need To Know
Whether you are designing or building a lift for commercial or private use, you carry responsibility for the safety of individuals using the lift, as specified in the
GlaxoSmithKline, London Core Drilling
Using specialist diamond drilling tools, allowing us to cut through the toughest reinforced concrete. As demonstrated, in the pictures below, in the photos at GlaxoSmithKline offices drilling through
Avon Gorge Hotel
Remove old lift and building works Contracted by Otis to remove the lift and alter the lift shaft to accommodate the new Gen 2 MRL Lift. Contracted by
Channel 4
Steel Works, Architraves and Electrical Works Contracted to carry out detailed steel modernisations to the shaft cap of the external scenic lifts. The work involved the design, fabrication
Heathrow Airport, D’Albiac House
Stripping lift and removal by cranage CBES stripped the old lift and removed by the old lift by cranage. To enable the lift installation CBES fitted new steelwork
Hoardings
Contact CBES for the supply and installation of hoardings, including bespoke hoardings and 2 hour rated certificated fireproof hoardings.
Testing Lifting Beams
As a full member of LEEA Lifting Equipment Engineers Association we are qualified to test all your lifting beam requirements and certify. We have tested lifting beams for
Welsh Rugby Union Shop, Cardiff
Platform Lift Working safely within an operational busy shop and not inconvenience the general public, CBES stripped out an existing 2 stop platform service lift and associated equipment
Pure Gym, Bristol
Builder works to new lift installation CBES was originally contracted to undertake all builders enabling works including building, mechanical, electrical, flooring, decorating and lift removal. Following further detailed
Care Home, Stockport
New Steel Lift Shaft Structure and Other Builders Works CBES were contracted to carry out all enabling works to include lift removal. It was found after the lift
The Colonnade, One Canada Square, London
One of the tallest buildings in the UK, One Canada Square is in a prestigious location of offices and retail. CBES were tasked with designing, fabricating, and fitting
Upgrade Canteen & Kitchen
Project management and complete installation of new canteen and kitchen area. Install temporary kitchen area, remove partitioning and ceilings, install new partitioning, new plumbing and gas, new electrical
Warehouse Electrical Re-Wire
A warehouse shed located within Avonmouth Docks, Bristol, approximately 300 meters long by 90 meters wide, originally fitted out as a cold store storage / distribution facility required
EV Chargers installation
Find the perfect solution to save energy and money ! As a government approved installer of electrical charge points under the Workplace Charging Scheme and the Home Charge
Energy Efficient LED Lighting
Our electrians offer a bespoke electrical design and installation service. We prefer to use LED lighting to help reduce costs and provide the best solution to illuminating key
Electrical Works Within The Food Industry
We design and install enhanced installations for processing environments including stainless steel installations, clean rooms and high care installations. All our electricians understand the standard operating procedures governing