Call Us Today:

Shearings hotel, Cornwall

Lift installation

Budget: £80,000

Duration: 12 weeks

Even though it was a difficult and complex construction of a steel lift shaft onto an existing staircase well, it was completed on time and within budget.  This prioject involved  site measuring, design, fabrication and lift installation into a difficult apperature.

client industries:

accreditations