CBES built scaffold around the M5 motorway bridge to enable the strengthening cable to be tested.
Exe viaduct, M5 Motorway

Budget: £40,000
Duration: 14 weeks
CBES lift engineering department removed and installed a lift shaft in a historic grade 1 listed building. This was a complicated and delicate project, as we had to ensure the old timbers finishers were retained. Also the new timbers had to be in keeping with the character of the building. Fire proofing was also carried out to comply with safety regulations. This project had to be extremely well planned, as it had to be completed successfully on a tight timescale.
Budget: £140,000
Duration: 4 months.
This project was combined two of our three key divisions: construction end electrical. The premise was to complete a building alteration to the existing building and the construction of a new reception area. Further to this we completed an installation of new electrics and air conditioning.
This was a listed building, and our task was modernise an existing lift shaft. The dificulty with this was that the building was a listed building. This meant that the lift had to be athetically in keeping with the character of the building. Also we had to re route the drains and divert them outside, whilst ensuring that the drainage was aesthetically in character with the listed building.
Project budget: £70,000
Duration: 14 weeks
At their new store in the St Davids Shopping Mall Cardiff our specialist team were contracted to design and form a steel frame and glass scenic lift into an existing shop unit. The project was a great visual success despite a tight schedule and a complex glass installation process.
CBES are at present refurbishing and wiring the existing buildings and offices for the provision of a new computer suite and associated services for the satellite communications industry.
client industries: