Bristol Water
Barrow Water treatment Works
The completion of an electrical installation to the monitoring and telemetry system to enable the temperature sensing to the chemical tanks at Barrow Water Treatment Works.
The completion of an electrical installation to the monitoring and telemetry system to enable the temperature sensing to the chemical tanks at Barrow Water Treatment Works.
We are currently working on a 17 week contract for the electrical installation of pumps within the two and a half mile HV tunnel linking Aust to South Wales.
Purton and Littleton Water Treatment Works.
Electrical installation to aerators on a raw water tank
CBES has recently completed the design, construction and installation of the electrical services for the instrumentation and control of the active flow plant. This £200k project was successfully completed to the program. The Plant now provides an essential source of emergency relief water for the Bristol Water supply.
client industries: